EHV Transmission Lines

EPC of 33 kV to 220 kV overhead lines — new lines, LILOs and evacuation lines — on S/C, D/C and M/C towers, on turnkey basis.

Overview

Transmission lines are the core of Hem Engineers’ work. We execute overhead lines on an EPC and turnkey basis — from survey and route approval through supply, erection, testing and commissioning — for utilities, renewable developers, railways and EPC partners.

Scope of work

  • New single-circuit (S/C), double-circuit (D/C) and multi-circuit (M/C) tower lines
  • LILO (loop-in loop-out) of existing lines at new and existing substations
  • Power-evacuation lines from solar, wind and hybrid plants
  • Supply lines to railway traction substations (TSS)
  • Supply, erection, testing and commissioning on turnkey basis

Related projects

View all 28 related projects

220 kV

Ongoing

Waghodiya (PGCIL) – Vyankatpura Line LILO

Client
GETCO
Voltage
220 kV
Length
30.86 km
Scope of work

220 kV LILO to proposed 220 kV Halol substation from the existing 220 kV D/C Waghodiya (PGCIL) – Vyankatpura line no. 1 with AL-59 conductor and 48F OPGW cable, on turnkey basis.

  • Transmission line

66 kV

Ongoing

66 kV Kim – Hariyal Line LILO

Client
GETCO
Voltage
66 kV
Scope of work

LILO to 66 kV Shahlon (Molvan) substation from 66 kV Kim – Hariyal Line No. 1.

  • Transmission line

Transmission line

Ongoing

Kukma GSS to Kukma TSS

Client
Rail Vikas Nigam Limited
Location
Kutch
Scope of work

Kukma GSS to Kukma TSS, Dist. Kutch, and any other TSS under the jurisdiction of RE Ahmedabad, on turnkey basis.

  • Transmission line
  • Railway traction supply

220 kV

Completed

Surel Solar Park

Client
Torrent Power
Voltage
220 kV
Length
41.00 km
Also
1 no. substation
Scope of work

EPC of 220 kV S/C line from Surel Solar Park to GETCO Bechraji substation, along with 1 no. substation.

  • Transmission line
  • Substation & bays
  • Renewable evacuation

220 kV

Completed

220 kV Palanpur – Kheralu Line

Client
GETCO
Voltage
220 kV
Length
12.626 km
Scope of work

EPC of 220 kV D/C Palanpur – Kheralu line at proposed 220 kV Sisrana (Satlasna) substation on D/C & M/C towers with AL-59 conductor and 48F OPGW cable.

  • Transmission line

220 kV

Completed

Shikarpur WF – Samakhiyali Line

Client
GETCO
Voltage
132 kV / 220 kV
Length
12.590 km
Scope of work

EPC of 132 kV D/C Shikarpur WF – Samakhiyali line at 220 kV Vondh S/S on 132 kV D/C & 220 kV M/C towers with ACSR Panther conductor and OPGW cable.

  • Transmission line
  • Renewable evacuation

Planning a transmission, substation or cabling project?

Talk to our team about scope, approvals and execution — from GETCO feasibility through to final CEIG clearance.