Services
One contractor from feasibility to energisation
Supply, erection, testing, commissioning and O&M — for lines, bays, switchyards and cable systems.
- 01
EHV Transmission Lines
EPC of 33 kV to 220 kV overhead lines — new lines, LILOs and evacuation lines — on S/C, D/C and M/C towers, on turnkey basis.
- New single-circuit (S/C), double-circuit (D/C) and multi-circuit (M/C) tower lines
- LILO (loop-in loop-out) of existing lines at new and existing substations
- Power-evacuation lines from solar, wind and hybrid plants
Scope & capabilities 28 projects
- 02
Substations, Feeder Bays & Switchyards
Feeder bays, reactor bays and remote-end switchyards from 66 kV to 400 kV, including AIS bays and turnkey equipment supply.
- 66 kV and 220 kV feeder bays, including AIS-based bays
- 400 kV reactor bays on EPC basis
- 400 kV remote-end switchyards for solar plants
Scope & capabilities 11 projects
- 03
Underground Cabling
66 kV and 220 kV XLPE underground cable laying, line conversion to UG cable and multi-year annual rate contracts.
- 66 kV and 220 kV XLPE cable laying, including FO cable
- Partial undergrounding of overhead lines and line shifting by UG cable
- Annual rate contracts (ARC) for cable laying across GETCO zones
Scope & capabilities 7 projects
- 04
Renewable Power Evacuation
Evacuation lines, bays and switchyards connecting solar parks, wind farms, hybrid and small-hydro plants to the grid.
- Power-evacuation lines from solar, wind and hybrid plants
- Feeder bays and remote-end switchyards at GETCO substations
- Evacuation works for small-hydro plants on SSNNL canals
Scope & capabilities 9 projects
- 05
Statutory Approvals & Liaisoning
Site selection, GETCO feasibility, route approval, Gazette notification and all statutory clearances through to CEIG approval.
- Assistance in identifying land banks suitable for the project and GETCO feasibility
- Preliminary survey and estimate processing through to final release by GETCO R&C
- Route approval and Gazette notification
Also delivered
- Operation & maintenance of substations, electrical plants and utilities
- Electrical, mechanical and civil engineering design
- Design-assist and value engineering
- Line shifting and diversion for infrastructure corridors
Planning a transmission, substation or cabling project?
Talk to our team about scope, approvals and execution — from GETCO feasibility through to final CEIG clearance.